Customer: Çalık Enerji A.Ş.
General Contractor: Mitsubishi Corporation
and Mitsubishi Hitachi Power Systems (MHPS)
End Customer: State Joint Stock Enterprise “Uzbekenergo”
Construction of the CCPP of 2x450 MW.
· The works on calculation of the category on explosion and fire safety of the premises, buildings and external installations as per the ShNK 2.01.19-09 and their approval with the relevant state bodies of RUz.
· revision of the detail design documentation for the compliance with the norms and requirements of the legislation of RUz and provision of the recommendations to the developed detail design documentation in the form of comments in English;
Implementation period: 2016 – 2019