Utilization of the low pressure gases at gas fields South Kemachi, Kruk, Western Kruk, Northern Urtabulak and Umid - BCS South Kemachi
End Customer: GAZPROM JV in Uzbekistan
General Contractor: Enter Engineering Pte., Ltd. (Singapore)
Project purpose:
Construction of the low pressure gases gathering system and the booster compressor stations (BCS) for utilization of the associated oil gases in the volume 2.6 million m3/day (0.955 billn m3/year) produced by the flare systems of the oil and condensate degassing units at Western Kruk, Kruk, Northern Urtabulak, Umid fields, and the separated gas of the Gas Complex Preparation Terminal of South Kemachi, and by supplying the compressed gas to the GCPT South Kemachi for treatment and further transportation to the CPF for processing.
Scope of work:
Development of the technical conditions (TC) on the turn-key basis, feasibility study of the project and development of the detailed design documentation:
- Stage - 1. Development of the technical specifications for the construction of the facility “Utilization of the low pressure associated gases on South Kemachi, Kruk, Western Kruk, Northern Urtabulak, Umid fields” on a turn-key basis.
- Stage - 2. Development of TEO of the project.
- Stage - 3. Development of the base project documentation.
- Stage - 4. Development of the detailed design documentation in full set and scope which is required for the realization of the construction of the facility.
- Stage - 5. Field construction supervision.
- Stage - 6. Works on updating and approval of the process regulation.
- Stage - 7. Execution of the works on development of the technical and engineering concept for the project “Construction of a mini-GCPT on the territory of the BCS South Kemachi”.
Work implementation period: 2013-2020