Pre-preparation and development of the documentation for the construction of the booster compressor station (BCS) at gas field Northern Nishan

Customer: GAZPROM JV in Uzbekistan

Construction of booster compressor station at Northern Nishan field on turn-key basis to maintain the pressure at the inlet to the gas processing unit during decrease of the formation pressure. The BCS will provide the compression of the gas, supplied from the gas-condensate field in the volume of 6.02 million m3 a day with the outlet pressure of 31.5 barg at the beginning of the operation (2014) and 1.6 million m3 a day with the outlet pressure of 5.0 barg by the end of the operation period (2033). The outlet pressure from the BCS is 80.0 bar.

Scope of work:

  • Stage-1: Development of the TEO and support during approval with the state bodies.
  • Stage-2. Development of a base project of the BCS including the solutions of the base design. At this stage the main technical solutions were implemented that touched all the sections of the project, process calculations, diagrams, data sheets, specifications and the list of equipment.

Work implementation period: 2013