Customer: GAZPROM JV in Uzbekistan
Construction of booster compressor station at Northern Nishan field on turn-key basis to maintain the pressure at the inlet to the gas processing unit during decrease of the formation pressure. The BCS will provide the compression of the gas, supplied from the gas-condensate field in the volume of 6.02 million m3 a day with the outlet pressure of 31.5 barg at the beginning of the operation (2014) and 1.6 million m3 a day with the outlet pressure of 5.0 barg by the end of the operation period (2033). The outlet pressure from the BCS is 80.0 bar.
Work implementation period: 2013