Work at FEED2 and design stages of the Construction of the gas-to-liquid fuel unit (UZGTL)
End Customer: OltinYol GTL, Uzbekistan
Scope of works for 2012:
General Contractor: Technip, (Italy)
FEED2 stage of development. Participation of SCATRA Limited during the development of the FEED2 stage and in the conceptual design of the main buildings, as well as the detail design of the building structures, process equipment and the pipe racks.
Scope of works for 2014:
End Customer: OltinYol GTL, Uzbekistan
General Contractor: HYUNDAI ENGINEERING CO., LTD. (Korea)
- Revision of design documentation of fire safety for the compliance with requirements of the Republic of Uzbekistan in the frames of Uzbekistan GTL project;
- Rendering consultative services on fire safety within the frames of the project on production of liquefied synthetic fuel GTL (GAS-TO-LIQUID) in the Republic of Uzbekistan;
- Revision of firefighting design documentation for the compliance with (existing) norms and rules effective on the territory of the Republic of Uzbekistan;
- Performance of category calculations of premises, buildings and external installations of CPF and Kandym group of fields on explosion and fire safety as per ShNK 2.01.19 in the frame of the project “Construction of a plant on production of liquefied synthetic fuel GTL (GAS-TO-LIQUID) in Uzbekistan”.
Scope of works for 2018 - 2020:
End Customer: OltinYol GTL, Uzbekistan
General Contractor: HYUNDAI ENGINEERING CO., LTD. (Korea)
- Design of the out of battery limit facilities “Project on production of the liquefied synthetic fuel in Uzbekistan (UZGTL)”.