End Customer: “LUKOIL Uzbekistan Operating Company” LLC
General Contractor: Enter Engineering Pte., Ltd. (Singapore)
The scope of the works included the development and correction of the documentation. The design documentation was developed based on the approvable part of the detail design.
Work implementation period: 2014